Showing posts with label Winter Preparations. Show all posts
Showing posts with label Winter Preparations. Show all posts

Wednesday, December 14, 2011

Mild Weather allows Late Year Projects

I thought by now it would be 'Beginning to look a lot like Christmas', but not just yet! After finishing leaf processing (mulching), winterizing the course (irrigation system and winter disease protection), covering the greens, removing all course furnishings, and finishing a few minor items related to the Paddle Project (drainage and site clean up) we thought it would be time to come inside and begin our winter equipment maint. and repair activities. The mild temperatures and lack of snowfall (one of the five lowest snow records to this date - only a half inch) have delayed that for now and this past week we've been able to work (or continue work) on a few outdoor projects.

A couple weeks ago we topdressed all fairways with sand (a program we began a couple years ago but just this fall expanded to include all 18) and aerated with shallow (4" deep) solid tines. Shortly thereafter we began a second fairway aeration but with larger tine sizes capable of penetrating up to 9-10 inches.  This depth helps break up compacted areas deeper in the rootzone aiding water penetration and root growth. The mild temperatures (no frozen ground yet) and snow free fairways, have allowed us to continue this process and our goal is to finish all before freezing conditions set in.
  Rafa continues the Verti-drain deep, solid tine aeration (minimally disruptive on the surface but yielding valuable soil compaction relief below) hoping to complete all fairways before it gets too cold!
As I've mentioned in earlier posts, the record flooding last summer, and then near record temperature and humidity that followed, caused turf thinning and some turf loss in several low, slow-to-drain areas in a few fairways. Throughout the fall and early winter we installed additional drainage pipe in these damaged areas and our goal is to ultimately add pipe and drop inlets (catch basins) in all such areas. The mild conditions we've had lately have allowed us to continue this work (on #18 fairway at the moment) and hopefully we'll have several more days before we have to rest the trencher. 

Hard to see from photo but this trench is less than 4 inches wide and allows our 2 inch flexible pipe to fit nicely followed by a covering of gravel and then an 8 inch finish layer of rootzone mix. The narrow cut will heal quickly in the spring with a little seed and normal encroachment of adjacent turf. I selected this process (narrow trench, small pipe) as opposed to typical 4 inch pipe (larger trench and scar) to minimize recover time and eliminate need for sod cutting and replacing. More trenching and pipe installed, and less repair, with this method.

Chances are pretty good that at some point our weather is going to become more typical and drop below freezing and stay this way for some time. It's a pretty safe bet. Unfortunately, some might say.  But for those whom enjoy the cold and snow (which also will likely come) we plan to once again flatten some tracks so that skate style skiing can be enjoyed. And speaking of skate style, this year we are adding another winter activity option (for those whom really like it cold and even freezing) and that is ice skating.

Nearly every year we are asked if we would allow skating on the ponds and we have always resisted due to the hazardous potential of dangerously thin ice. Also, several of our ponds are aerated (oxygenated for fish health) and so the ice never completely forms on these ponds. This year however, in looking at the area just north of the Paddle Facility, in the rough west of #14 fairway, we determined that an ice staking area could be developed. After doing some research we decided to go forward with it and so an ice rink is now in the works! We purchased a simple to erect, reusable ice rink kit that includes shallow walls (plastic panels), supports, a durable plastic liner, liner protector for walls, and an ice resurfacer tool. It's a nice size of 40 x 96 and we'll likely add some lights for your evening skating pleasure. It's our first time at ice making and rink maintenance but I think we'll figure it out and hopefully have a nice place for you to skate with family, then kick off the skates and go inside the Paddle House to warm your toes by the fire! Hopefully you'll have some fun!

Ice Rink walls (supports and panels) begins after leveling a few low areas with sand.

Ice Rink walls up and we now await onset of consistent below freezing temperatures so that we can place liner, kick plates, bumper caps, fill with water and begin to make ice.

By the way if you are wondering if the turf area beneath the liner will be damaged by ice, that was one of the first things we wanted to know too and from our research we found that with this being rough grasses (bluegrasses, fescues) they are quite tolerant, and in fact the area under cover may emerge greener and healthier next spring. So with that, here's hoping for a good cold spell after next week!  I'll post again when we get ready to finish the "Rink at Skokie"!


Thursday, November 25, 2010

A Whirlwind of Activities Completed

It's been a week (or I should say less than a half week) of frenetic pace as we completed several "winterization" tasks. The forecast is showing temperatures to fall into the teens overnight Thanksgiving into Friday, and remain below freezing thereafter, for at least a couple days. These extended low temperatures will likely begin to freeze the soil surface and so in essence, it was time to "put the course to bed".
In the last three days we've accomplished:
  • Deep, Solid Tine Aeration of Greens
  • Rolling to Smooth (Greens)
  • Sand Topdressing & Brushing (Greens)
  • Plant Protectant Applications for Snow Mold Diseases (Greens, Tees, Fairways, & Bunker Faces)
  • Late-Season Nutrient Applications (Greens, Tees, Approaches & Fairways)
  • Covering of Greens and several Tees
  • Winterizing Irrigation System
  • Renovation of Tee Surrounds at No. 10. (near completion)
 Jacob (on #2 Grn) and Rafa (on #13 Grn) performing Deep Aeration (1/2" dia. x 10" deep)
Having second tractor/aerator unit (our much older unit was down for repairs several times during process) was compliments of  Lake Shore Country Club and Supt., Jeff Frentz. This was a HUGE help and we couldn't have completed all we needed to this week without, "getting by with a little help from  our friends" !

 Channels created will aide moisture movement off surface and provide oxygen and gas exchange during winter months, and help allow deeper root growth in spring.

Rolling followed Deep Aeration and then Sand Topdressing (shown above) followed. Applying sand now helps protect the crowns of the turf (the point where shoot growth originates) throughout winter.

 
 Brushing, (to smooth and incorporate sand) followed Topdressing.

 
 Plant Protectant Applications followed to guard against Snow Mold Diseases. All Greens, Tees, Approaches, Fairways, and Bunker Faces were treated.

 
 Ryan applies Nutrients (mostly slow release for early spring availability) after Plant Protectant App. had dried. Similar nutrient applications were also applied to Tees, Approaches, Fairways, Green and Tee Surrounds, and high traffic areas in the Rough.

 Final Greens task was placing and securing Greencovers.
Staples are used to secure them and they cannot be installed once the ground is frozen. Hence the urgency this week, as temps will soon be falling sharply!


 Winterizing Irrigation System - Compressed air is used to "blow out" all lines, sprinkler heads, pump station equipment, and pond fill lines.

It was a little cold outside the last couple days! 
Ice formation from a nearby sprinkler being activated to blow out water.


 Sneaking in an improvement project before the ground freezes (and sod becomes unavailable)
Replacing contaminated sod on slope surrounding No. 10 tees. 

 
Old tie steps and dated landscape was removed to provide a look more similar to all of our other tees. A small set of rough timber steps will be installed if deemed necessary in future.

Greens "Put to Bed" and ready for a long winter's nap!

With it being Thanksgiving today I can't help thinking about the many things I'm thankful for, but one for sure is my terrific Grounds Operation Staff. Time and time again during this challenging year, they have answered the call. Whatever the situation; from ice in the winter; to floods in the spring (and again in summer); to heat in the summer; to tournament preparations and recovery tasks; to completing myriad special projects; and now to multiple winterization tasks in a few short days, over and over again they have answered the call of duty!
I couldn't be more thankful! 

Happy Thanksgiving to All! 

Wednesday, December 23, 2009

All Covered Up

I started this post a few weeks ago and then had a few difficulties getting pictures uploaded but now these issues have been resolved. At the time we had just covered (thinking we were just in time for that matter!) the greens, as the temperatures were dipping below freezing, snowfall was predicted, and accumulation was likely.

 Green covering took place on Dec. 2nd &3rd

The date of our annual green covering, and the closing of the greens until spring, varies from year to year (dictated by freezing temperatures) and is preceded by several tasks including; deep tine aeration, topdressing, setting temporary hole locations in the approaches, nutrient applications (designed to be available for plant uptake as soon as the grounds thaws in early spring), and a final plant protectant application.
This final plant protection, which helps control fungi that cause snow mold diseases, is applied as late in the year as possible, and as close to what we believe (a little weather prediction involved) could be a lasting snow cover. A good hard freeze prior to, and then a nice blanket of snow, is always preferred, since snow falling on unfrozen ground can actually insulate it and provide an ideal environment for certain snow mold fungi, but we can't control this.  What we can do is apply protection products before snow is expected and this was completed just prior to our placing of the greens covers.

For the twentieth year now we have used greens covers which are a permeable material made with a double layer, woven, translucent polyethylene and bonded with a unique lace coating. I believe they have been very beneficial for the following reasons:

  • Protect against the desiccating affects of cold dry wind should it be an "open" low snow cover winter.
  • Protect against debris and other undesirable accumulation and damage from geese, deer, and coyote.
  • Protect against walkers, cross country skiers, joggers, etc., when greens are frost covered.
  • Enhances soil warming in early spring leading to earlier root growth, and earlier dormancy break and spring green up.   
  • Allows late season aeration versus more common immediate post Labor Day timing, providing a longer period, well into late fall, of undisturbed putting surfaces. 
  • Should damage occur due to disease or ice (covers allow air and moisture to pass so ice can still accumulate) the covers will enhance new seed germination from overseeding and general plant recovery.

 All tucked in for winter!


Well, as it turned out, our covering process was indeed quite timely as the ground froze and has remained frozen since then. Snow cover has been nearly continuous, at least in the shorter turf areas (greens, tees, and fairways) where the soil is not as well insulated by the plants as it is in longer turf (rough) areas. Yesterday a new blanket of the fluffy white stuff fell and more is falling as I write this, so Mother Nature has the entire course well covered at the moment and it appears as though it will be this way for some time. It's quite nice for Christmas and it protects in much the same way that our green covers do, but a mid-winter thaw often occurs and the green covers will then, and continuing on into spring, provide the many valuable benefits that they have for many past years.


Mother Nature's Natural Covering!

      Monday, November 23, 2009

      Winterizing the Course

      We certainly had a bonus regarding the weather this past weekend. Aside from a little frost delay, the days turned out sunny and mild and it was great to see a good bit of "late season" play. Was it the last good weather weekend? Time will surely tell, but as Thanksgiving approaches, the inevitable cold, snow, and frozen soil, looms on the horizon and our focus this past weekend turned to preparing the course for winter.

      A frosty start to a beautiful weekend. Hopefully not the last! 

      Winterizing the course actually began a few weeks ago with nutrient applications targeted to extend photosynthesis (which improves energy storage) as well as strengthen the turf plants aiding cold stress tolerance. These applications were completed on all turf areas (greens, tees, fairways, rough) and while they are very important, our activities over the weekend were essential and included clearing water from the irrigation system, the tennis court sprinkler system, and drinking water lines, and applying plant protection products to greens, tees, and fairways to prevent winter disease activity.
      The process of clearing the irrigation system and other water lines involves attaching an air compressor capable of producing a large volume of air to the main line pipe at the pump station and then actuating every head (nearly 2000 now) individually, until all water is "blown" free. Additionally, manual coupling valves are cleared and the pump station is thoroughly drained.


      The big "Blower"...a 750 Cubic Feet / Minute Compressor 


      Adding some mist to the morning...an almost clear sprinkler 


      All clear...until next spring 

      Our other critically important "winterization" task is plant protectant applications to prevent two potentially damaging diseases. There are fungi that can cause disease at any time of the year, and the early winter through spring period is unfortunately no exception.


       Plant Protection in Action

      A very common disease active during our current cool and damp conditions (and continuing until warm temperatures return next spring) is a disease called Microdochium Patch.

       
       Microdochium Patch (photo fortunately not from SCC!)

      When snow cover eventually occurs, another less common but more destructive disease is called Typhula Blight, or more commonly known as Gray Snow Mold. Snow cover actually provides an insulating layer for this fungi, preventing it from drying out.

       
      Typhula Blight (photo fortunately not from SCC!)



      Microdochium Blight - (this one is from #17 at SCC -now treated!)
      These two diseases are generally our main off season concern and the primary targets of our late fall/winter preventive plant protectant applications.

      Additional winterizing tasks include deep tine aeration and sand topdressing of the greens (which began today) and covering of the greens and several tees prior to freezing conditions. Hopefully these "freezing conditions" are still several weeks away!
      ***If you are a first time visitor to this blog and would like to view our Welcome Message, which includes the 2008 Year in Review slide show, click HERE.