Sunday, August 7, 2011

July Recap in Pictures

The last month or so has been challenging in many ways (a nice way of saying cruel!) with record rainfall, extreme and prolonged humidity, wind storms, power outages, paddle project site work, tournament and event preparations, turf disease, flood damaged turf, mosquitoes, flies, cart recovery from channel, and probably a half dozen other "challenges"! With all this fun I haven't had much time to blog. Each of the above could be an entry on it's own but I thought today I would recap the past month in photo/caption form.
 Mid-July, Mowing and more frequent rolling in early preparations for Derby

Bunker prep with sand depths of all checked, sand redistributed and added as needed, surfaces smoothed, runners (turf that has encroached into sand) removed, edges compacted and smoothed. They were all ready for Derby.

 Rafa and Javier perform annual pre-Derby "harvesting" of cattails at pond #18 
(and other ponds too)

 Jacob, Carlos, Alo, add fabric and stone and then level in areas which will be under the five new paddle court locations. Gravel helps melt water drain better, keeps area (and heaters beneath) cleaner and drier, and makes heater servicing more accessible.

 Believe it or not irrigation was needed through first 3 weeks of July. We had only approx. 1" of rain from the middle of June through the third week of July. Hard to remember it being dry huh?

 On this day we were seeing a nice dry sheen and a little spritz was needed to limit any wilting and potential mower injury.

 Jacob adds just the right amount of water, only where needed, to keep surfaces fast and firm.

Then the rains came and in about 12 days (July 23-Aug. 3) we were left with 10+ inches.
 Here in afternoon on July 23rd I'm turning on a few sprinklers in the flooded areas to add cooler water to the rapidly warming water. Perhaps it helped to lessen the damage, as in these areas the resulting turf loss is minimal.

 As the waters receded this was a familiar sight. Here Urbano squeegees on #3 fairway.

We put a lot of wear on these this year! 

 This guy's wondering where the water went? It quickly drained in this bunker on #2 but the sediment that the flood waters left behind would need to be hand scraped and discarded to prevent contamination and potential future diminished drainage.

 By the way... It's been damn hot at times! 101 degrees in the shade!

 With all the water gone (and hopefully heavy rain and extreme heat past) we now see areas were turf is damaged. Repairs have already begun and include additional drain pipe installation where needed, and one or more processes such as aeration, sand topdressing, spiking, seeding, and sodding.

 This goes in the category of "Anything is possible on the golf course!"
 
 It was a miserably hot day so Jacob didn't mind jumping in to secure a tow strap to the front bumper. We pulled it out with our 4X4 Dump Truck and now Ed has a new bridge railing project!

 Back to the Paddle Courts. Here I'm digging for the main electric feed from the Grounds Operations Center. We've got some additional drainage to add near the courts too and landscaping to install before long.

 Mornings and sights like this help us forget the many "challenges" we've faced this year.
Looking forward to a long, mild fall!

Saturday, July 23, 2011

Derby Storm

It's getting all to frequent that at some point in a multiple day tournament the skies open up, or the winds whip up, or the air and humidity heat up, and we are left with some form of damage to... clean-up!

Last night's storm dropped another 5 inches of rain on top of the Day 1 Derby total of 1.5. You can do the math but suffice is to say it was enough to put portions or entire fairways, of nearly every hole, underwater.

The photos below give a reasonable picture of what the course looked like this morning. Some haven't changed much moving into the afternoon:
Hole #10

Hole #13

Hole #3

Hole #6

New Duck Pond on #8  
-This was after a much larger area had drained

Holes -4,11,3,13 - From 4 Tee to 13 Green underwater this morning

Brick Cart Path at #17 Tee

Crushed Brick Path near 18th Green
- completely washed down to lower approach

Fun stuff huh? We're pumping, squeegeeing, replacing sand in bunkers (only a couple though), raking debris and in general prepping so that, hopefully, the first round of Derby can be completed and a second round can be started and completed as well. More on Derby...Pre-prep, storm, and storm repair, later.
 
We go 30 days without much rain at all and then just when we don't want any we get 6.5 inches! I guess next time we're in a long dry spell and need some rain, all we'll have to do is hold a tournament! Chances are it will rain! 

Things could be much worse. There was a flurry of activity at a home near the 15th green this morning with several fire trucks blocking our entrance.
Firefighter putting out remains of a probable lightning induced fire that burned the entire roof and likely destroyed much of home content. Fortunately the family was gone on vacation.

Puts things into perspective... We'll have a delay in our tournament, and may lose some grass due to standing water heating up and suffocating it, but this family probably will lose their home!

Tuesday, July 12, 2011

Old Fashioned Style Watering

Round Three. Another powerful storm ripped through Chicagoland yesterday and left over 800,000 customers without power including Skokie Country Club and the Grounds Operation Center and (of  potentially critical importance) our Pumping Station.

This storm actually was fairly mild in terms of tree debris left for clean-up but power supply was disrupted (and still is as of tonight) and with no power there is no ability to run irrigation pump motors, and therefore, no water available from the usual manner. During the last storm with extended power outage (4 days) soil was moist from plentiful rain, temperatures were cool, and skies were cloudy. Very low turf and personal stress.
Conditions during this outage are much different with no rain for three weeks (and very little rain from the storm), temperatures warm to very warm, and clear, sunny skies. Much greater turf and personal stress!
While I tossed and turned last night I had visions of my plan, for today's putting surface watering, dancing in my head. With a large component of our putting surfaces being poa annua there is little tolerance for weather stresses, whether from; high or low air temperatures, high or low soil moisture levels, and/or high or low humidity levels. As such we started early this morning using our jetter tank and our sprayer tank, along with small gasoline powered water pumps, and directly pumping from our ponds as well, to provide a modest amount of water to sustain the greens for the day.

It was slow going, as it took three of us (plus extra help during filling procedures) nearly six hours each to irrigate all the greens, a task which usually can be performed automatically with our 1800 gallon per minute pumping station, a mere 15-20 minutes total! What can I say...sometimes you have to do things the old fashioned way. Hopefully not very long though!

First things first...setting up generator cart to power coffee pot... then fuel pumps!

 Steve and Mike filling up jetter tank

Steve watering 1st of many greens.

 Here I'm watering 13 green directly from ponds/channel. Did same at 3,9,11, &12

Jacob with sprayer tank & small pump on #17. One of several he watered.
The pumps that we all used each produced approx. 12 Gallons Per Minute!


 The 3-60 HP motors capable of pumping 1800 Gallon Per Minute, that I hope are running tomorrow!!!

Saturday, July 2, 2011

Weather Extremes Continue

It's been one of the oddest weather years I can remember in many years. Cold and wet for much of the spring, a few record hot days sprinkled in, then temperatures cooled off again, then, as summer began, two wind storms ripped though the course, and now as of Independence Day weekend, high temperatures and record heat indices are expected. Will conditions ever moderate? Less just hope that the month of July is somewhat normal without extreme heat, extreme humidity, extreme wind speed, or extreme rainfall or lack thereof!

Last Tuesday night high winds in excess of  70 mph caused tree loss, power loss, and tree debris to be strewn about the course. Six trees were destroyed, either blown over or split apart and many others lost significant limbs and numerous small branches. Our on-going tree management efforts which includes maintenance pruning and removals as necessary, surely limited the amount of tree damage we might otherwise would have received. We lost power to the Grounds Operation Center (and also the Helps Quarters, Paddle Facility, Irrigation Pumping Station, and Half Way House -all fed off the same power lines) and it remained off until Friday morning. Of all of these areas, what can potentially be devastating in an extended outage is lack of power to the Irrigation Pumping Station. Obviously, without power, pumps cannot run and irrigation cannot proceed. If weather conditions at the same time are hot and dry, turf can be severely stressed and turf loss could occur. In spite of bad luck having the storm occur and cause two full days of course clean-up for our grounds staff, the good luck was that it was cloudy, cool, and turf did not require any irrigation. A good thing indeed!

 The "Debris Field" June 22

The old apple tree near Half Way House, uprooted

 Willow on #11 lost approx. 1/3 of canopy. Perhaps time to remove in winter??

   Half of the canopy of this Hackberry on #7 was split, disfiguring to point that removal was necessary

 
Another example of large limbs that fell. This is an Ash on #15

Ryan and Gus in full "buck-up" mode

After a few long days of clean-up the course was back to normal, but then another wind storm came through this past week leaving behind another deposit of branches and leaves requiring yet another day of debris removal. Our Grounds Staff once again rose to the challenge and not only prepared the course for a busy holiday weekend but also spent a good portion of the day cleaning debris. Three clean-up day's in a week and a half is more than enough for a while! A little moderation on the weather front would be nice for a change!

Monday, June 20, 2011

Kiltie Days Recap

With a golf season thus far of up and down temperatures and frequent rainfall, we have to cross our fingers prior to any event and hope for full cooperation from Mother Nature. We certainly got our wish with Kiltie Days this past weekend! Aside from almost an inch of rain on Wednesday, the tournament weather conditions on Thursday, Friday, and Saturday were mild and dry and about as good for golf as we could get. From all accounts I think it was one of the most successful Kiltie Days to date!

Prior to any major event such as Kiltie Days, or the Derby, there is a significant amount of course preparation involved. We schedule maintenance activities to peak at the same time as the event. Topdressing, plant protection (disease and insect management), growth regulation, and detailing programs (edging sprinkler heads, markers, and drains, edging cart paths, filling divots, removing runners/grass clumps in bunkers, removing sucker sprouts on trees, and more) are all addressed. And, of course, mowing of all primary play areas is performed each day and repeated often, as is the case for greens. Double mowing each morning, followed by greens rolling, and single mowing each evening (also often followed by rolling) is employed to provide the ball roll speed challenge that competitors enjoy, or at least think they enjoy!

 Quality mowing begins with sharp and well adjusted mowers. Here Mike (and his friend Gato) inspect a bedknife in the process of being sharpened

Rafa, and Miguel (in background on bunker rake machine), smooth and adjust depths of sand

Mowing and Rolling equipment head out for tournament evening tasks

In addition to these course maintenance activities, other items such as erecting the scoreboard, finishing up projects ( at this time #5 Mound & the Half Way House fence/landscape replacement) and other assorted tasks such building and setting the target "gong" for this year's Kiltie Days, add up to a very busy pre-tournament period. It's always a rather feverish and sometimes very challenging time for us, but when the tournament is underway and players are enjoying the competition, it's also a very rewarding feeling knowing that our efforts have made a significant contribution to the success of the event.

 
Mound project at #5 after hauling material and shaping

Mound seeded, drainage installed, & final prep for sod 

 Sod, seed, and mulch blanket in place

Resolving one of several drainage issues along haul road route

Mulch blanket installed post seeding along length of #5

After all work was complete we came in this morning to see this.
Do you suppose it was the rope, or the bright orange ribbons, or the different color sod that this cart driver was oblivious too???

This pix shows the damage a little better. Just thrills me to have to repair this!

 Apparently this rope is not visible enough either!

Fescue beginning to emerge above blanket. We intentionally seeded at a low rate to see if this tall rough area will be more playable than other such areas. Establishment will be slower but it may be a benefit long term.

A quick project at Half Way House. These overgrown shrubs and deteriorated fence needed to be changed.
New fence, enlarged stoop, new shrubs, more road space, much better! 

Beautiful day and nice crowd watch playoffs for this year's Kiltie Days Championship.

With a few weeks now before tournament preparations for our next "major", The Skokie Derby, begin, we'll keep plenty busy with routine mowing, trimming, raking, topdressing, plant protection,and more and we'll add a few projects or two such as drainage in a few places and re-grassing a portion of the bank at No. 9 pond.
I'll keep you posted of these activities.



***If you are a first time visitor to this blog and would like to view our Welcome Message, which includes the 2008 Year in Review slide show, click HERE.